Home Build – Week 6
This week, not much happened on the exterior of the house, but there was a flurry of activity inside. The electricians, HVAC crew, and plumber were all hard at work this week. The furnace and most of the ductwork was installed as well as all the wiring and electrical boxes. Also, the bathtubs were placed and the plumbing inside the walls was routed. It looks like they are about ready to wrap up the work that will be buried within the walls. So, they should be ready to start insulating this coming week. One little snag we ran into this week was the dryer vent got installed in the wrong wall of the closet. However, the contractors quickly corrected it after I pointed it out. Also, the window installer came back to correct the mixed up window I mentioned last week.
The most exciting part of this week, was seeing the stone installed on the exterior with our address marker. We are very happy with how things are looking, and the quality of work that has been done thus far. All the contractors are doing a great job.
Day 42 – 78 days and counting.