Home Build – Week 5

Take a look back to last week, and you’ll see how much was accomplished this week! It’s amazing to me the transformation in such a short time. The rough framing went really quickly and is already complete. They also put in windows, shingled the roof, and started electrical work. We did notice one oops, that Read More

Home Build – Week 4

This week in our home building process the basement floor was poured, and the framing started. It’s amazing how fast thing seem to go when they get to this point. It seems like we went from a hole in the ground to a house in a matter of a week! We also finally got our Read More

Home Build – Week 3

This week in the home build, the foundation was back-filled, and the underground plumbing was installed. I climbed down into the basement to take a peak at things today. I was a little puzzled when I couldn’t find any interior drain tile around the footings. Then I found a cut section of the footing forms, and Read More

Home Build – Week 2

It was pretty exciting early this week with the home build. The foundation was completed and a temporary electrical service was installed. After the forms came off the foundation though, there was no action the rest of the week. The foundation needs several days of curing to solidify enough to back-fill against it.The back-filling will happen this coming week, Read More

Home Build – Week 1

The build has begun. This week, we closed on our lot, the builder scraped it, leveled it out, surveyed, dug for the basement and footings, and poured footings. By the end of next week, hopefully we’ll have a full foundation. Stay tuned.

Home Build – The Rock

In our last home build blog, we talked about signing the building contract, and picking out some more finishes. Since then we’ve lined up insurance, had an appraisal, and finalized the construction loan. Of course, we are still trying to plan out the little details in the house, too. With everything lined up and ready Read More

Home Build – Bids, Finishes, and Contract

Well NOW it’s official, we are building a house. Today we signed the building contract; this means our contingency for purchasing the lot is satisfied and we can move forward! (Wife Comment: YAY!) Yesterday, we took the day off and visited Nonn’s  Designer Showplace for a second time. Last time we selected counter tops and Read More

Home Build – The Finishes

This week we started selecting the finishes for our new home. We met with an interior designer Thursday who gave us our options for cabinetry and countertops. I knew this would be challenging, but I didn’t realize how challenging. There was a huge amount of options including; door styles, cabinet types, colors, full extension drawers, Read More

Home Build – The Plans

In my last post about building our home, I talked about making modifications to the builder’s plans. Since then, we have received a revised set of plans and made a few more changes. Kinsey & I are to the point where most of the changes being made are very minor. We added two windows to Read More

Home Build – The Beginning

Now that we have a lot under contract, we have tons of planning and decision making to get us to the end result of a new home. Prior to offering on the lot we had met with a builder, talked about ballpark pricing, and looked at some plans. We walked into the initial meeting with Read More

← Older posts Newer posts →

LATEST BLOG POST

more from the blog

We donate 10% of all
commissions to a charity of our
client's choice

RECENT DONATIONS

more about charity program
buy it sell it